This was the first large restoration project. It included a redesign of the front of the church, the replacement of over 10,000 brick, repair of stress fractures, some re-pointing, dismantling of a large section of chimney on the bell tower, placement of a 10′ angel statue, caulking, chemical cleaning, and concrete work (sub contracted).